Our Projects
022105-C06 Delta Towers II
2022 | Bladimir Ventura
Our company proudly partnered with the US National Park Service NCR on a significant project to structurally repair an historical gem, the Peirce Barn, located at Peirce Barn Location. The objective was to increase the building’s floor capacity by designing a comprehensive solution. This included the installation of new blocks and the incorporation of Laminated Veneer Lumber (LVL) into the existing floors while preserving the delicate integrity of this cherished structure. Our meticulous work not only ensured the structural enhancement of the Peirce Barn but also contributed to the continued preservation of its rich history. We invite you to explore the Peirce Barn and experience its historical significance at https://www.nps.gov/rocr/planyourvisit/peirce-barn-directions.htm
Rock Creek Park - Install Fire Protection and Security Systems at Historic Peirce Barn in Washington, DC
2022 | Bladimir Ventura
Building 1450 A& B Wing Building 1452 Replace Fire Alarm Control Panels and associated auxiliary components
2022 | Bladimir Ventura
22104 USDA Knee-Wall Repairs 1301 Ditto Ave Ft Dietrick MD
2022 | Bladimir Ventura
Project #22101 SSA Door Operators 6201 Security Blvd Woodlawn MD
2022 | Bladimir Ventura
CLEAN and SEAL REDHORSE FACILITY PROJECT NUMBER: ERVD 20-2022
2022 | Daniel Goodwin
BLDG 768, SUITE 214 (LANGLEY AFB), HAMPTON VA 23665-2207
This project holds immense significance as it not only rejuvenated the building’s aesthetics but also plays a pivotal role in maintaining a highly functional and professional workspace. USPFO Langley Air Force Installation is instrumental in supporting critical missions and operations, making it essential to provide an environment that fosters efficiency and excellence. Our work contributes to the agency’s mission success and reinforces our commitment to delivering exceptional results for our valued clients.
BLDG 102 Relocate Cabinet Washer
2022 | Luis Gonzalez
SSA PEB Fire Protection System Upgrades
2022 | Bladimir Ventura
Our primary objective extended beyond repair; it encompassed ensuring safety for all. In particular, we focused on synchronization to prevent any unintended consequences, such as triggering photosensitive epileptic seizures. This dedication to precision and safety reflects our unwavering commitment to our clients’ unique needs, even in the most challenging and sensitive environments.
21078 BOA -B312 Locker Room Renovation
2021 | Bladimir Ventura
B1181 PAX RIVER US MILITARY DOG KENNEL ADDITION
2021 | Bladimir Ventura
F-35 stealth fighter jet - B2133, REPLACE 8" AFFF PIPE AND 2 PUMPS NAS Patuxent River MD
2021 | Bladimir Ventura
CAA Painting Project
2021 | Bladimir Ventura
Union Collective Warehouse Upgrade
2021 | Brian Rodriguez
21025 BOA B2113 Add Exterior Door
2021 | Fermin Rodriguez
IPL21Q2 B2044 MAKE BUILDING ADA ACCESSIBLE
2019 | Bladimir Ventura
This project reflects our commitment to inclusivity and accessibility in all environments, even those with the highest security standards. Our efforts not only enhance the facility’s compliance but also contribute to making it more accommodating for all individuals, ensuring that everyone, regardless of ability, can navigate the premises with ease and dignity.
B2805 - Repair & Seal Fire Suppression Water Tank
2021 | Ben Rodriguez
Our commitment to excellence shines through in every aspect of this project. We delivered a flawless restoration that not only met but exceeded all regulatory requirements, guaranteeing the utmost reliability and readiness in protecting this vital facility.
This project stands as a testament to our dedication to serving our nation’s most critical infrastructure needs. We were honored to contribute to the protection of assets that play a pivotal role in safeguarding the highest office in the land.
JOHN PETER VAN NESS ELEMENTARY SCHOOL ADDITION – PHASE II
2021 | Fermin Rodriguez
Allen Bradley - Brand name Supply
2019 | Bladimir Ventura